1. A completed application and 2 sets of plans must be submitted to the Site Committee.
One set will be returned to the owner and one set retained by the committee. Plans shall
be drawn to scale and include a site plan, all four elevation views, and a section of
exterior wall construction. Structural information with foundation reinforcement, floor
and roof specifications shall also be included. Applicants should apply no later than the
25th of the month- Site Committee will meet the first Monday of each month - The
Management committee will make final determination of the application no later than the
25th of the following month.
461~
BOOK .11 rRtti:JE J 7 J
Response:
2. Homes shall he a minimum of 1,000 sq. ft on the main level, excluding the
basement and garage. Setbacks are 25 feet at the front, 15 feet from the sides and 20 feet
at the back. Note: Corner lots require 25 feet at both sides facing the street. The lot
corners shall be clearly marked for the site committee at the time the application is
submitted.
Response:
3. All homes, garages, and permanent structures shall be built on site and must be built
to local and_uniform building codes as well as meet local seismic criteria for our area.
Response:
4 .Footings shall be reinforced concrete. Foundations shall be reinforced concrete or
block. No more than 16" of the foundation shall be exposed unless the Site Committee
approves a variance:
Response:
5. Exterior walls shall be of6" construction, 8-foot minimum height and comply with the
following:. .
2 x 6 construction @ 16" O.c. with APA rated exterior sheating.
2 x 6 construction @ 24" O.c. can be used for single story structures as long as the
layout matches the truss layout. This option would require
~ " cox plywood subsiding & 5/8 sheetrock interiors.
Exterior garage wall may be framed with 2x4 construction @16" O.c.
Response:
-
.-
-
-
-
-
Od7{~Ob':l
[7 'L
6. Roof structures shall be designed for a minimum of 80 Ib live load and engineered
drawings submitted to the Site Committee for approval. Roof Pitch shall be no les than
4 -12 with a minimum ofa 16" overhang. Ridge heights shall not exceed 30 feet
(chimneys may extend to 32 feet). Roofing material shall be of composition shingles,
cedar or shake shingles, tile or metal. Colors shall be neutral or earth tones
complimentary to the house and neighborhood. Colors shall be submitted to the Site
Committee for approval.
Response:
7. Windows must be insulated units in the heated portions ofthe house. Specifications
and product data shall be submitted to the Site Committee for review. Windows must
have performance abilities needed in our extreme climate. All egress requirements will be
strictly enforced and tempered units must he marked with a "T" on the floor plans so the
Site Committee can detennine codes will be met.
Response:
8. Building, insulation should meet the following minimum requirements:
a. Subfloor @ crawl spaces -R-30
Note: Crawl Spaces must be adequately vented
b. Exterior Walls -R-19
c. Roofs and attics -R-42
Note: Roofs must be vented at the eaves with relief venting at the gables or ridge.
Response:
9. Exterior siding shall be embossed metal or vinyl horizontal siding, (vinyl siding must
be a minimum of .055 thickness) wood, brick or stucco. Finish shall be non-glossy
neutral or earth tone colors and approved by the Site Committee.
Response:
H). Porches and Decks can be constructed of concrete or wood with adequate
reinforcement or framing. All handrails must meet local and uniform building codes.
Response:
....lIII
""""lIII
U8t;40S'l
173
11. Garages must match the home in materials and colors.
Response:
12. After approval by the Site Committee the property owner shall have one year to
complete the construction ofthe home. (The Site Committee must approve any
extensions if special circumstances exist).
Response:
13. Approval of the Site Committee shall be valid for two years. Ifconstruction has not
begun within this time a new approval must be applied for.
Response:
14. Landscaping, driveway, and sidewalks shall be completed within two years after the
start of construction and present a clean and neat appearance with a positive slope away
from the house.
Response:
15. Fencing or detached structures other than a garage must be approved by the
management committee.
Response:
16. A building permit must be obtained from the Town of Alpine and posted on site
before construction begins.
Response:
Applicant's Signature
Date
-~
-
-
':""
.:itzf:
. '::3~~~~f:'
il
."~. .
...C\~l..
;1\
;0':
....'
"""'lIIIl
08~i'il084
174
Notarized signatures for the Riverview Meadows Property Owners'
Site Committee Rules and Regulations.
The foregoing instrp~n~ was signed in,my presence by
this / I day of ~/ 200Q t
W' ness my hand and official 1.
~]t~
^~
Bill Flowers, President
State of Wyoming
55
COWlty ofLincoIn
,"
"
otary lie
My commission expires:~.M/;5' ,;;jl!JtJ d-......
-,',
-...
~)
-]