Loading...
HomeMy WebLinkAbout943575 ASSIGNMENT OF EXISTING EASEMENT RIGHTS 00ö848 For $10 and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, EOG Resources, Inc., with an address of 600 Seventeenth Street, Suite 1000 North, Denver, Colorado, 80202, does hereby transfer, convey and assign to Williams Field Services Company, LLC, with an address of One Williams Center, WRC3-9, Tulsa, Oklahoma 74172, the following described existing easement rights, limited to the route described ("Pipeline Route") on the lands described in Exhibit A hereto ("Subject Lands") situated in Lincoln County and Sweetwater County, Wyoming: 1. Those certain easement rights and pipeline obligations arising under the Oil and Gas Lease dated June 10, 1976 by and between Champlin Petroleum Company, as lessor, and Amoco Production Company, as lessee, Recorded in Book 130PR, Page 588, Document No. 484407, to install, operate, and maintain a pipeline in and along the Pipeline Route on the Subject Lands to connect the Fabian Ditch 558-27E well. 2. Those certain surface use rights and pipeline obligations arising under the Surface Owner's Agreement dated June 3, 1982 by and between Broadbent Land Company, LP, as grantor, and Champlin Petroleum Company, as grantee, Recorded in Book 732, Page 235, to install, operate, and maintain a pipeline in and along the Pipeline Route on the Subject Lands to connect the Fabian Ditch 558-27E well, as such use pertains to the E/2, Section 27, Township 19 North, Range 112 West, 6th P.M., Sweetwater County, Wyoming. 3. Those certain surface use rights and pipeline obligations arising under the Surface Owner's Agreement dated June 3, 1982 by and between Broadbent Land Company, LP, as grantor, and Champlin Petroleum Company, as grantee, Recorded in Book 188, Page 820, to install, operate, and maintain a pipeline in and along the Pipeline Route on the Subject Lands to connect the Fabian Ditch 559-27E well, as such use pertains to the W/2, Section 27, Township 19 North, Range 112 West, 6th P.M., Lincoln County, Wyoming. (i~ ! 7 In addition to the foregoing, this Assignment is expressly made subject to the provisions of that certain Gas Gathering, Processing, Dehydrating and Treating Agreement dated February 1,2004, as amended, and to all restrictions, exceptions, reservations, conditions, limitations, interests and other matters, if any, whether of record or not. Assignor shall properly execute, acknowledge, and file this instrument of record immediately upon receipt thereof, and will furnish to Assignee the recording data promptly after Assignor receives such recorded instrument from the clerk in each county in which this instrument is recorded. The terms, covenants and conditions hereof shall be binding upon, and shall inure to the benefit of, the Assignor and the Assignee and their respective successors and assigns. -:1 DATED this 21 st day of October, 2008. EOG RESOURCES, INC. RECEIVED 11/12/2008 at 3:36 PM RECEIVING # 943575 BOOK: 708 PAGE: 848 JEANNE WAGNER LINCOLN COUNTY CLERK, KEMMERER, WY B;Z;:~~~ Kurt D. Doerr Title: A ent and Attorne -in-Fact STATE OF COLORADO) )§ COUNTY OF DENVER ) The foregoing instrument was acknowledged before me by Kurt D. Doerr, on behalf of EOG Resources, Inc., this 21st day of October, 2008. WITNESS my hand and official seal. My commission expires: 2/13/2010 úOü849 EXHIBIT "A" Attached to and made a part of that certain Assignment of Existing Easement Rights, dated October 21, 2008 by and between, EOG Resources, Inc. and Williams Field Services Company, LLC. EOG RESOURCES, INC. FABIAN DITCH #558-27E WELL SECTION 27, T19N, Rl12W, 6th P.M. LINCOLN & SWEETWATER COUNTIES, WYOMING PIPELINE EASEMENT DESCRIPTION CONVEYING A 50' WIDE CONSTRUCTION RIGHT-OF-WAY (25' ON EACH SIDE OF THE BELOW DESCRIBED PIPELINE) AND TRASNFERRING A 30' WIDE PERMANENT RIGHT-OF-WAY (15' ON EACH SIDE OF THE FOLLOWING DESCRIBED PIPELINE ROUTE): PIPELINE ROUTE DESCRIPTION: BEGINNING AT A POINT IN THE NW1/4 SEl/4 OF SECTION 27, T19N, Rl12W, 6th P.M. WHICH BEARS S71°36'47"E 3855.3' FROM THE WEST QUARTER CORNER OF SAID SECTION 27, THENCE N12°9'43"E 134.8'; THENCE N37°30'46"W 438.7'; THENCE N26°44'19"W 506.6'; THENCE N45°4'22"W 322.7'; THENCE N71°18'8"W 133.3'; THENCE S71°22'29"W 134.0'; TO A POINT IN THE NW1/4 SE1/4 OF SECTION 27, T19N, R112W, 6th P.M. WHICH BEARS S45°05'15"E 3806.0' FROM THE NORTHWEST CORNER OF SAID SECTION 27. THE LENGTH OF THE ABOVE DESCRIBES SURVEY LINE IS 1670.0 FEET, OR 101.212 RODS, OR 0.316 MILES.