HomeMy WebLinkAbout949124WHEN RECORDED RETURN TO:
Jenifer E. Scoggin, Esq.
Holland & Hart, LLP
P.O. Box 1347
Cheyenne, WY 82003
(307) 778-4200
RECEIVED 8/27/2009 at 11:59 AM
RECEIVING # 949124
BOOK: 730 PAGE: 609
JEANNE WAGNER
LINCOLN COUNTY CLERK, KEMMERER, WY
CIO6609
STATE OF WYOMING
COUNTY OF LINCOLN
)Ss.
RELEASE OF LIEN
Pursuant to Wyo. Stat. Ann. § 29-1-302, the undersigned hereby files its notice of
satisfaction of lien statement and hereby fully and completely releases said liens filed with the
Clerk of Lincoln County on the 11th day of March, 2009, as Instrument Number 945831, at Page
441 of Book 717.
The Name of the Lien Claimant is Prairie Pipeline Contractors, Inc., P.O. Box 67,
Plentywood, Montana 59254, who filed a lien statement in the sum of Nine million, nine hundred
eleven thousand, four hundred five and 31/100 dollars ($9,911,405.31), together with interest,
costs and attorney fees. The lien covered interests in real property and improvements held by
and related to Overland Pass Pipeline Company, LLC, 100 West Fifth Street, Tulsa, Oklahoma
74103, its agents, successors, predecessors, or assigns, as referenced by Document No. 0928049,
Book 653, Pages 89-91, attached hereto as Exhibit A.
Dated this4~U day of '2009.
By:
Name: L• L}~C A.S-'
Title: -
{00022482 3 }
ACKNOWLEDGEMENT
STATE OF. U~
)
ss.
COUNTY OF Sa I~• ,~z~~
COV610
This instrument was acknowledged before me on ,Q ( 2009 by
G. ~.aC~asse as ~ ~.i I of :prair►t kc lir►e. (°ov►~r~~~crs, :Che.
Seal:
r"' now t ..a ..w Notary PNow ublic
1 G NICALEE NELSON
Commission #►578236
my Commission Evk" • Signatu e of notarial officer
NovsmbO 4, 20111 1 l ~9 r~~
L. low sum 0wo S~tat ~c~ Utah, j Title and Rank
My commission expires: y • A0/ 2
{00022482 3 }
EXHIBIT A
LOT
(~~2t304~
No. : TOWNSHIP 21 NORTH, F. )GE 114 WEST, of the
6th P.M., COUNTY OF LINCOLN, STATE OF WYOMING
AC p TT/~i / /J
SCALE 1" - 10001
500' 0 1000'
APPARENT
owNERSHIP6
WILUMIS GAS
PROCESSING
COMPANY
TITLE OJfORNAMON
PROVIDED BY: IITI.LBROS
FOUND MONUMENT
SECTION CORNER
eao FOUND MONUMENT
QUARTER CORNER
♦ PROJECTED CORNM
® FOUND MONUMENT
LOT CORNER
UTM 13 NORTH (NAO b3)
000089
1
e N"
_
5 00'35'32' E 2046.16
q5" • w ~16Y.~ s
- 1-
I
~
LOTJ
'
I
SEE rotwslr e•
I
/r------
7 - _ _ _ _ _
Z:z
44 COr 1
1 tar e
27
~
LOT No. 37 z1 ~
~
2T
ACARINO
DISTANCE
I
11
S 051102 W
165
L2
5 3555w
901.66
LOT 6
f
26
'
I
LOT 7
I
1I
14 "
25
STATEMEW 0E SUMIEYLIR:
- Ja Len
CMAP.LES r WO00, STAN --;XT ; AW ai OCCUUPArDON A MAIL VF WYOMW
LAND SURVEYOR REGISTRATION N
598 EMPLOYED BY OVERLAND PASS PIPELINE
o
to 6 es F. Ww
o.
COMPANY LLC TO MAKE A PRELIMINARY SURVEY OF THE CENTERLINE OF A
,
A
~
PIPELINE RIGHT=OF-WAY AS DESCRIBED AND SHOWN ON THIS MAP; THAT THE
o
6B
Q
SURVEY OF SVD WORK WAS MME UNDER MY SUPERVISION AND AUTHORITY.
COMMENCING ON THE 5TH OF DECEMBER. 2005: AND THAT SUCH SURVEY IS
ACCURATELY REPRESENTED UPON THIS MAP.
7 04
Totol R-O-W Width Q~eeL
Dow
_Z5_LefE 25 Right of CmhrNns.
Iyy
Ap
EX
/067.4ti Fsst,ods,~(.Z2,~Acrea HtBfF A
OMT
rota Temporary Mbrk Spoe.-_0 6~L Acroe.
Total Addltkonol Tsmpormy Work Space a45!-Aer s.
A MAP SHOWING A
AWJW AASS009TEA; NO.
wo"v 'sum-
PROPOSED PIPELINE RIGHT-OF-WAY
'F0M 0
lom NA0" ""M'°'
PREPARED FOR.
OVERLAND PASS PIPELINE COMPANYLLC
TRACTAW600-W-u-WI
SCAL& 1-•1000•
.
DM. AAm 8004tF-0001
DATE WM)6
OVERLAND PASS PIPELINE PROJECT
D1Pt)./"AJa. 1~
l1RErr1 OF
000612
~
SHEET 2 OF 3
41528049 OP-W Y-,1-0w l
PIPELINE
LEGAL DESCRIPTION 0000,90
OF
A PROPOSED PIPELINE RIGHT-OF-WAY
ACROSS
WRUAMS GAS PROCESSING CO*ANYLANDS
FOR
O VEItiAND PASS PIPEL NE CO+ANY LLC.
JUNE 23, 2006
A RIGHT-OF-WAY, 50.00 FEET WIDE FOR A PROPOSED PIPELINE, LYING WITHIN LOT 37,
TOWNSHIP 21 NORTH, RANGE 114 WEST, 6TH PRINCIPAL MERIDIAN, LINCOLN COUNTY,
WYOMING, LYING 25.00 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE:
COMMENCING AT THE NORTHEAST SECTION CORNER, OF SECTION 27, TOWNSHIP 21 NORTH,
RANGE 114 WEST, 6T" PRINCIPAL MERIDIAN, LINCOLN, COUNTY, WYOMING, THENCE SOUTH
80°25'38" WEST, 4,769.18 FEET TO THE TRUE POINT OF BEGINNING;
THENCE SOUTH 05°I 1'02" WEST, 165.80 FEET;
THENCE SOUTH 35025'53" WEST, 901.66 FEET TO THE POINT OF TERM lfUS AND A POINT' ONOR
NEAR THE EAST LINE OF SAID LOT 37, SAID POINT BEING SOUTH 00°35'32" EAST, 2,046.16 FEET
FROM THE NORTHWEST SECTION CORNER OF SAID SECTION 27.
THE TOTAL LENGTH OF A PIPELINE RIGHT-OF-WAY ACROSS WILLIAMS GAS PROCESSING
COMPANY LANDS AS DESCRIBED ABOVE IS 1,067.46 FEET OR 64.69 RODS, CONTAINING 1.225
ACRES, MORE OR LESS.
REFERENCE DRAWING No. 890-RE-0001 (EXHIBIT A)
000613
LOT No. 37, JWNSHIP 21 NORTH, RAN. - 114 WEST, of
49 the 6th P.M., COUNTY OF LINCOLN, STATE OF WYOMING
0-0061A
C-0;; 4
REFERENCE DRAWING No. 690-RE-0001
raid Twnparary Nbr* Space-1J¢.M.Acres
turd Add/tlond Tampa my Wor* 50ac&__Q_4A9 Acrea. EXHIBIT 8
M/ WWa A8lOL'Wr4 WC.
`
A MAP SHOWING
PROPOSED TEMPORARY USE AREAS
M
PREPARED FOR:
++en
I~Ir
OVERLAND PASS PIPELINE COMPANYLLC.
7MOTNo, of-wv4s0001
WALE I&V
OVERLAND PASS PIPELINE PROJECT
DWG. AA% apolo -mm
DA M, &V$M
Ono dO/ Ma. tries
Sf n a of
BEGIN lZ ROW