HomeMy WebLinkAboutPZC Staff Report 102-CUP-24 Flat Creek RV Park AdditionsLINCOLN COUNTY PLANNING &ZONING COMMISSION
STAFF REPORT
Conditional Use Permit
HEARING TIME AND DATE:6:00 p.m.,January 24,2024
LOCATION:Lincoln County Courthouse,Commissioner Boardroom 3rd Floor,Kemmerer,
Wyoming &Afton Planning &Development Office,61 E.5th Ave.,Afton,Wyoming
FILE #102-CUP-24
APPLICANTS:Viking Development,LLC ℅David Allred &Trent Veigel
PROJECT NAME:Flat Creek RV Park Modification
COMMUNITY PLAN AREA:Thayne
ZONING:Mixed
PLANNER:Emmett Mavy
PIN:3419-234-00-178
______________________________________________________________________________
PLANNING STAFF RECOMMENDATION:
Planning staff recommends that the Planning &Zoning Commission send a recommendation of
APPROVAL to the Board of County Commissioners for File #102-CUP-24,a proposal to
modify three buildings,and add two additional buildings,with
Findings of Approval A through D
Conditions of Approval 1 through 11
______________________________________________________________________________
PROPOSAL:To make modifications to the Flat Creek Rv Park in Thayne,Wyoming.The new
owners wish to improve the property by adding a new office,moving and expanding their
laundry and bathrooms,remodeling their storage building,and adding 10 storage units for
rentals.Details of each request is below;
Modification to Building #1 This is the storage pole barn at the rear of the property.The size
of this building is 32 X 62.This building is in much need of repair and is being used to store
seasonal equipment,and heavy equipment.The function of this building will remain the same,
we would like to fix it up,put garage doors on it and enclose it.
Modification to Building #2 This building includes the bathrooms,laundry room and the well
pump equipment.The size of this building is 10 X 30.The laundry room is too small for the
amount of use it gets and the bathrooms are terrible.We would like to eliminate the laundry and
the bathrooms from this building and put them in building #3.The proposed use for this building
will be just to accommodate the well pump equipment and storage.
Modification to Building #3 This building is currently being used as the office and storage.
The current size of this building is about 50 X 40 which includes a storage lean-to on one side
and a garage and lean-to on the other side.We would like to remove the garage and lean-to's on
both sides and convert this building into the new laundry facility and bathrooms.This will make
the new building size around 26 X 30.
Addition of Building #4 This building will be a new addition to the park and will be the new
office and mail center.This building will be small.16 X 12.We want the office to be in a better
and more visible location.This will also provide a better and safer place to drop off mail and
packages.
Addition of Building #5 This building will be a new addition to the park and will be a 10 unit
storage facility.This building will be 20 X 100 and will provide the opportunity for some of the
residents to store their personal belongings on site and help keep the park free of clutter.
This project is proposed on a 14.66 acres parcel along FLat Creek in Thayne,Wyoming.Property
is within the Mixed-Use zone and appropriate for the requested changes inside their RV Park.
Access is from Hokanson Ave a block off HWY 89.Property is adjacent to the city limits of
Thayne,WY with residential uses on the North,South,West,and agriculture to the East.
LOCATION:The location is roughly 0 miles south of the Town of Thayne,Wyoming,Section
23 T34N R119W.
______________________________________________________________________________
FINDINGS OF APPROVAL:
A.The proposal is consistent with the provisions of Wyoming Statute 18-5-203 providing for
Board of County Commissioner authority for zoning regulation of buildings and uses of
land.
B.The proposed use,with conditions,is consistent with the goals and objectives of the
Lincoln County Comprehensive Plan.
C.The proposed use,with conditions,will not substantially impair the appropriate use of
neighboring property;and will serve the public need,convenience and welfare.
D.The proposed use is consistent with the provisions of the Lincoln County Land Use
Regulations,specifically:
a.Chapter 3 Section 3.1 Conditional Use Procedures;
b.The provisions for the Thayne Community Plan Overlay Zone;
CONDITIONS OF APPROVAL:
1.This permit is to operate the uses outlined in the project description.Significant alterations
from the uses described or a modification of structures from the original application shall
require additional permitting.
2.The Applicant shall have a StormWater Pollution Prevention Plan on site during
construction compliant with WYDEQ.
3.A Wyoming State Fire Marshal “Plan Review”may be required on these commercial
buildings and if a plan review is required the plan must be approved prior to running the
business in these buildings.
4.Project must meet International Building Code (IBC)and International Fire Code (IFC)
Onsite Requirements.An inspection by the Fire Code Inspector prior to operation may be
needed.The IBC and Fire Code 2021 /2024 shall be used for the remodeled buildings and
new structures.
5.The construction of Building #5 (10 unit storage facility)will require a 25’setback.
6.The construction of Building #4 (Office)will require a 40’setback.
7.Any temporary,moveable,or permanent building,structure,shed or shipping container
placed onsite must obtain a Permit from Lincoln County,prior to being moved onto the
property.
8.Additional Buffering is not required by the proposed modifications.
9.All buildings must comply with the Lincoln County Lighting Standards as set out in Chapter
6.10 Lighting (includes Exterior Lighting and Glare).All lighting must be shielded from
view of vehicles and bulbs not visible from the property boundaries or highway.
10.Outside storage of vehicles or trailers is not permitted in the cul-de-sac area to preserve
space for emergency vehicles to turn around.
11.This permit is not approving any signs.All signage must be approved by the Planning
department through application of a sign permit.This can be done after approval of the
Conditional Use Permit.
______________________________________________________________________________
ATTACHMENTS:
1.Vicinity Map
2.Site Plan
3.Project Narrative and Request
4.Photos
5.Correspondence
6.Old Permits
_____________________________________________________________________
BACKGROUND:
Flat Creek RV Park has been in Lincoln County a long time and is a grandfathered use.It went
through a modification in 1990 to add a cabin and storage building.Today the new owners wish to
improve the property by adding a new office,moving and expanding their laundry and bathrooms,
remodeling their storage building,and adding 10 storage units for rentals.
CORRESPONDENCE:
Town of Thayne,Wyoming:Did not provide comments
Public Comment:N/A
£¤89 Thayne
18
30
19
27
23
26
22
15 14
24
25
13
34N 119W 34N
118W TrueHillsideEstateRoadJ e r r y L a n e
£¤89Thayne
AMERICAN
SPORTSMAN REALTY
HOLDINGS, LLC
JOHNSTON, DARREL
R & GEORGEC TRUSTEES
BROWN, DON L
& CATHERINEM OKESON
WRIGHTFAMILY
TRUST
WRIGHT
FAMILYTRUST
COGGINS,ROBERT F
& BARBARA
TOWN OF
THAYNE
AMERICAN
SPORTSMAN REALTYHOLDINGS, LLC
AMERICAN
SPORTSMAN REALTY
HOLDINGS, LLC
CLARK, TYSON
TOWN OF
THAYNE
BURTON,
DUSTIN K
VIKING
DEVELOPMENT, LCHOKANSON,NEIL B &
DIANNA L
TOWN OFTHAYNE
TOWN OF
THAYNE
SHERIDAN,
TAYLOR
CEMETERY
TERRELL,
WILLIAM M
& APRIL S
SILVER CANYON
PROPERTIES, LLC
LOWER
VALLEY,
LLC
LOWERVALLEY, LLC
RKBT
ENTERPRISES,
LTD
TERRELL,WILLIAM M
& APRIL S
BYRD, JOSEPH
T & CARLY A
RKBTENTERPRISES,
LTD
BFLHOLDINGS,
LLC
MARK JOHNSON
HOLDINGS, LLC
MERRITT ENTERPRISES,
INC
BURTON-CAMPBELL,
DAVID C
Maxar, Microsoft
Conditional Use Permit
Roads
Road_Type
US Highways
WY Highways
Projects
Public Noticing
Township & Range
Sections
Municipalities
File No 102 CUP 24
Flat Creek RV Park
Viking Development, LLC
Prepared using available data by Katie Gipson on 2 Jan. 2024. Map is for informational purposes only and in no way represents an official survey of land.