HomeMy WebLinkAbout877919 (August 1985) ' ,~suing Office
KE,..I~'LEflER FIEL.,D OFFICE
DEPARTMENT OF THE INTERIOR .- .:, , ,: i'i i:. I ,,
BUREAU OF LAND MANAGEMENT
' RIGHT-OF-WAY GRANT
SERIAL NUMBER WYW-152809 )300~.~.pi~ PAGE_~
1. A right-of-way is hereby granted pursuant to Title V of the Federal Land Policy and Management Act of October 21,
1976 (90 Stat. 2776; 43 U.S.C. 1761).
2, Nature of Interest:
a. By this instrument, the holder:
Mountain Gas Resources
12000 North Pecos Street
Denver, CO 80234-3439
receives a right to construct, operate, maintain, and terminate a(n) R/W for construction, operation and
maintenance of a 6" pipeline for the Helwig 31-8 pipeline, on public lands described as follows:
6th Principle Meridian, Lincoln County, Wyoming
T. 20N., R. 112W.,
section 8:SW~,4NE1,4
b. The right-of-way area granted herein is 50' feet wide, 25' feet long and contains 0.03 acres, more or less.
c. This instrument shall terminate on December 31,2031, unless, prior thereto, it is relinquished, abandoned,
terminated, or modified pursuant to the terms and conditions of this instrument or of any applicable Federal
law or regulation.
d. This instrument may be' renewed. If renewed, the right-of-way shall be subject to the regulations existing at
the time of renewa and any other terms and conditions that the authorized officer deems necessary to
protect the public interest.
e. Notwithstandi'ng the expiration of this instrument or any renewal thereof, early relinquishment,
abandonment, Or termination, the provisions of this instrument, to the extent applicable, shall continue in
effect and shall~ be 'binding on the holder, its successors, or assigns, until they have fully satisfied the
obligations and/or liabilities accruing herein before or on account of the expiration, or prior termination, of
the grant.
3. Rental: '
For and in consideration of the rights granted, the holder agrees to pay the Bureau of Land Management fair
market value rental as determined by the authorized officer unless specifically exempted from such
payment by regulation. Provided, however, that the rental may be adjusted by the authorized officer,
whenever necessary, to reflect changes in the fair market rental value as determined by the application of
sound business manac~ement principles, and so far as practicable and feasible, in accordance with
comparable commercial practices.
4. Terms and Conditions:
a. This grant or permit is issued subject to the holder's compliance with all applicable regulations contained ~n
Title 43 Code of Federal Regulations part 2800.
b. Upon grant termination by the authorized officer, all improvements shall be removed from the public lands
within 90 days, or otherwise disposed of as provided in paragraph (4)(d) or as directed by the authorized
officer.
c. Each grant issued for a term of 20 years or more shall, at a minimum, be reviewed by the authorized officer
at the end of the 20th year and at regular intervals thereafter not to exceed 10 years. Provided, however,
that a right-of-way granted herein may be reviewed at any time deemed necessary by the authorized officer.
d. The stipulations, plans, maps, or designs set forth in Exhibit A & B, dated November 7, 2001, attached
hereto, are incorporated into and made a part of this grant instrument as fully and effectively as if they were
set forth herein in their entirety.
e. Failure of the holder to comply with applicable law or any provision of this right-of-way grant shall constitute
grounds for suspension or termination thereof.
f. The holder shall perform all operations in a good and workmanlike manner Jo as to ensure protection of the
environment and the health and safety of the public.
g. The holder shall construct, operate, and maintain the facilities, improvements, and structures within this
right-of-way in strict conformity .with the plan of development which was approved and made part of the grant
on November 7, 2001. Any relocation, additional construction, or use that is not in accord with the
approved plan of development, shall not be initiated without the prior written approval of the authorized
officer. A copy of the complete right-of-way grant, including all stipulations and approved plan of
development, shall be made available on the right-of-way area during construction, operation, and
termination to the authorized officer. Noncompliance with the above will be grounds for immediate
temporary suspension of activities if it constitutes a threat to public health and safety or the environment.
h. Any cultural and/or paleontological resource (historic or prehistoric site or object) discovered by the holder,
or any person working on his' behalf, on public or Federal land shall be immediately reported to the
authorized officer. Holder shall suspend all operations in the immediate area of such discovery until written
authorization to proceed is issued by the authorized officer. An evaluation of the discovery will be made by
the authorized officer to determine appropriate actions to, prevent the loss of significant cultural or scientific
values. The ~older will be responsible for the cost of evaluation and any decision as to proper mitigation
measures will: be made by the authorized officer after consulting with the holder.
i. The Holder shall be responsible' for total control of all invasive/noxious weed species on any and all
disturbed sites. The Holder is responsible for consultation with the Authorized Officer and/or local
- authorities for acceptable weed control methods, and shall comply with the following:
Use of pesticides/herbicides shall comply with all applicable Federal and State laws. Pesticides/herbicides
shall be used only in accordance with their registered uses within limitations imposed by the Secretary of
the Interior. Prior to the use of the pesticides/herbicides, the Holder shall obtain from the Authorized
Officer, written approval of a Pesticide/Herbicide Use Proposal Plan showing the type and quantity of
material to be used, pest(s) to be controlled, method of application, locations of storage and disposal of
containers, and any other information deemed necessary by the Authorized Officer.
3
Applicator(s) Of chemicals used must have completed the pesticide/herbicide certification training and have
a current up to date Certified Pe;sticide/Herbicide Applicator's License.
Pesticide/Herbicide Application Records for the areas and acres treated must be submitted to the BLM
Kemmerer Field Office each year. This includes the following:
Brand or Product name
EPA registration number
Total amount applied (use rate #A,l./acre)
, Date of application
Location of application
Size of area treated
Method of treatment (air/ground)
Name of applicator ,,
Certification number
Amount of surfactants or dyes used in spraying operation
The record information must be recorded no later than 14 days following the pesticide/herbicide application
and must be maintained for ten years.
Construction, drilling, and completion activity as well as other surface disturbance will be prohibited during
the period from November 15 to April 30 for the protection of big game winter range.
Any exceptions to this requirement must have prior written approval from the authorized officer.
k. Ninety days prior to termination of the right-of-way, the holder shall contact the authorized officer to arrange
a joint inspection of the. right-of-way. This inspection will be held to agree to an acceptable termination (and
rehabilitation) plan. This plan shall include, but is not limited to, removal of facilities, drainage structures, or
surface material, recontouring, topsoiling, or seeding. The authorized officer must approve the plan in
writing prior to the holder's commencement of any termination activities.
IN WITNESS WHEREOF, The undersigned agrees to the terms and conditions of this right-of-way grant.
(Title)
(Date) (Effective ~ate ~Grant)
WYW-ID2U09
EXHIBIT A
NOVEMBER 7, 2001
PLAN OF DEVELOPlVIENT
TO ACCO~~
Heiwig 31-8 Well Connect
GAS GATinG L~ ~PLICATION :- .
I. PROJECT DESCRIPTION
The buried 6 inch steel pipeline will head in a southerly direction from Helwig 31-8 Well,
located in the Northeast quarter of Section 8, Township 20 North, Range 112 West to .'
connect into an existing pipeline situated in the Northeast quarter of Section 8, Township 20
North, Range 112 West, Lincoln County, Wyoming.
The total length of the right-of-way is approximately 25 feet, of which 25 feet are on Federal
lands. A 50 foot wide corridor is requested for construction, operational and maintenance
purposes.
The pipeline will consist ofa 6 inch pipe, O. 156 inch wall thickness, Grade X-42 pipe with a
maximum operating pressure of approximately 1200 psig. -
Associated facilities include valving and metering.
All permanent above ground facilities, piping, and valving will be a flat, non-contrasting color
harmonious with the .surrounding landscape. Present warehouse stock colors comprise of
either Carlsbad CanyOn (2.5Y 6/2) or Desert Brown (10 YR 6/3).
II. RECONNAISSANCE AND LOCATION
Reconnaissance reveals that the route selected was the most practical route in relation to the
well location and the nearest collector pipeline.
No other alternatives were considered because the proposed route utilizes existing surface
scars as much as possible.
III. ANCILLARy RIGHTS OF WAY AND PERMITS
Mountain Gas Resources, Inc. will secure all rights of way on adjacent non-federal lands prior
J to pipeline construction. Mountain Gas Resources, Inc. will notify authorized right of way
users of Mountain Gas Resources, Inc.'s proposed pipeline crossings or overlaps on the
grounds occupied by the affected right of way users.
Any associated road and utility permits will be secured from the appropriate regulatory
agency prior to construction.
All equipment and vehicular access into the pipeline project will be confined to existing
roads and the established right of way corridor. No major reconstruction or rerouting
of these roads is intended.
IV. DESIGN
The design, construction, engineering, maintenance and inspection of the proposed
pipeline will be directed by Mountain Gas Resources, Inc. personnel.
V. CONSTRUCTION ,
All design, material, and construction, operation, maintenance, and termination
practices shall be in accordance with safe and proven engineering practices.
Construction sites shall be maintained in a sanitary condition at all times; waste
materials at those sites shall be disposed of promptly at an appropriate waste disposal
site. "Waste" means all discarded matter including human waste, trash, garbage,
refuse, oil drums, petroleum products, ashes and equipment. '
A litter policing program shall be implemented by the holder, and approved of in
writing by the authorized officer, which covers all roads and sites associated with the
right of way.
Pipeline construction will commence when all permits and right of way documents
have been secured.
Mountain Gas Resources, Inc. will notify the authorized officer 2 to 5 days in advance
of starting any constrUction activities. All private surface landowners will be
contacted prior to construction for access and surface usage.
Mountain Gas Resources, Inc. will not allow any construction or routine maintenance
activities during periods when soil is too wet to adequately support construction
equipment. If such equipment creates surface ruts in excess of 4 inches deep,
Mountain Gas Resources, Inc. will deem that soil conditions are too wet to
adequately support construction equipment. Construction activities will' not be
allowed until soil conditions improve.
Construction Of the proposed pipeline will occur in a planned sequence of pipeline
operations along the route. The construction period will last approximately 2 weeks.
All construction materials will be hauled to the job by truck, as needed, and strung
along the right of way as it arrives. Pipe will be strung in such a manner as to cause
the least interfi~rence with the normal use of the land crossed by the right-of:way. A
motor grader with a blade will be used to knock down vegetation, such as sage brush
within as much of the fifty foot right-of-way as is needed to provide a safe working
2
area. A wheel trencher will be used to dig the trench,, stacking the dirt beside the!'~ [i '0
ditch. After the pipe is placed in the ditch a motor grader or caterpillar will be used to
push the dirt back into the trench. The fill on the trench will then be tamped into
place with the grader wheels, leaving a berm of four inches to accommodate settling.
Disturbance of the top soil within the right-of-way will be kept to a minimum. In areas
of excessively steep hillsides.or to provide a smooth approach to a cut or gully, as
well as at stream bank crossings and at established work stations, some blading may
be required to provide a safe and suitable Working area for the equipment and
workers. When this occurs the top six inches of soil will be stock piled on the side of
theright-of-way and spread back over the area from which it was taken, after the final
grading. Before seeding any disturbed areas (ii' applicable), the right of way will be
restored to its original form, slope, contour, and soil density to the extent practicable.
The construction force is expected to numberapproximately six to eight persons at
the peak of construction. No temporary work camps are proposed.
The following is a list of construction equipment proposed on the pipeline project:
a. 1 Welding Truck
b. t Tractor Trailer
c. 1 Two Ton Truck
'd. 4 Pickup Trucks
e. 1 Seed Driller and Tractor (if applicable)
f. 1 Backhoe
g. 1 Trackhoe
h. 1 Side Boom Caterpillar ~
After pipeline construction is completed, pipeline markerswill be installed at specified
i'ntervals for identifying the pipe's location.
No toxic Substances are proposed for use in connection with the construction project;
however if toxic substances are required, usage shall, conform with provisions of the
Toxic Substances Control Act of 1976, as amended (40 CFR Part 702-799). Any
release of'tdXic substances (leaks, spills, etc.) in excess of the reportable quantity as
established by 40 CFR. Part 117.3 shall be reported as required by the Comprehensive
Environmental ResPonse, Compensation, and Liability Act, Section 102 B. A copy of
any requested report required by any Federal or State agency of a reportable release
or spill of any hazardous material shall be fi~rnished to the authorized officer within 5
working days of the occurrence of the spill or release.
The bolder(s) shall comply with all applicable Federal laws and regulations existing or
hereafter enacted or promulgated. In any event, the holder(s) shall comply with the
3
Toxic Substances Control Act of 1976, as amended (15 U.S.C. 2601, et seq.) with
regard to anY toxic substances that are used, generated by or stored on the right of
way or on facilities authorized under this right of way grant.(See 40 CFR, Part 702-
799 and especially, provisions on polychlorinated biphenyls, 40 CFR 761.1-761.193.)
Additionally, any' release of toxic substances (leaks, spills, etc.) in excess of the
reportable quantity established by 40 CFR, Part 117 shall be reported as required by
the Comprehensive Environmental Response, Compensation and Liability Act of
1980, Section 102b. A copy of any report required or requested by any Federal
agency or State government as a result of a reportable release or spill of any toxic
substances shall be furnished to the authorized officer concurrent with the filing of the
reports to the involved Federal agency or State government.
The holder of right of way No. agrees to indemnifij the United States
against any liability arising from the release of any hazardous substance or hazardous
waste (as these terms are defined in the Comprehensive Environmental Response,
Compensation and Liability Act of 1980, 42 U.S.C. 9601, et seq. or the Resource
Conservation and Recovery Act of 1976, 42 U. S. C. 6901 et seq.) on the right of way
(unless the release or threatened release is wholly unrelated to the right of way
holder's activity on the right of way. This agreement applied without regard to
whether a release is caused by the holder, its agent, or unrelated thir'd parties.
Prior to any discharge, hydrostatic testing water will be tested and processed, if
necessary, to ensure that the water meets local, State or Federal water quality
standards. Prior to discharge of hydrostatic testing water from the pipeline, the holder
shall design and install a suitable energy dissipator at the outlets, and design and install
suitable channel protection structures necessary to ensure that there will be no erosion
or scouring of natural channels within the affected watershed as a result of such
discharge. The holder will be held responsible for any erosion or scouring resulting
from such dischargel Sandbags, rock, or other materials or objects installed shall be
removed from the site upon completion of hydrostatic testing.
IV OPERATION AND MAINTENANCE
The pipeline 'will be routinely patrolled and inspected by foot or by vehicle to check
for problems such as erosion, right of way condition, unauthorized encroachment on
the right of way and any other situations that could cause a safety hazard or require
preventive maintenance. If damage shall occur to the pipe from external sources,
repair or replacement of the portion of the pipeline may be necessary. Detailed line
~ break and emergency procedures are used as routine operational procedures of
~Mountain Gas Resources, Inc..
After construction is completed, the pipeline will be hydro-tested using water from the
Green River. The procedure consists of pressurizing incremental segments of the pipe
to not less than 1.1 times its designed operating pressure. The test period will bee 8
4
hours to verify the pipe integrity. The water will be drained into a small pit(s) at
either end of the tested line to minimize erosion.
The holder shall conduct all activities associated with the construction, operation, and
termination of the right of way within the authorized limits of the right of way.
VII STABILIZATION AND ABANDONMENT
Following the completion of the pipeline test, the right of way traversed by the
pipeline construction will be restored in accordance with the landowner's requirement,
or those agencies having jurisdiction. All disturbed areas will be recontoured so that
the disturbed area blends into the surrounding terrain. Appropriate measures will be
taken to prevent erosion through the use of construction diversiOn terrages, rip-rap,
matting, and water bars.
All disturbed areas along the pipeline corridor will be reseeded to the landowner's or
regulatory agency's specifications. Seed will be planted using a drill and in areas not
suitable for drilling, the seed will be broadcasted and raked or chained to cover the
seed. The application rate and seed mixture will comply to the landowner's or
regulatory agency's specifications.
Upland Sites Seed Mix
Species Variet~ Drill Seeding Rate
Western wheatgrass , Rosanna 6 lbs/acre PLS
Thickspike wheatgrass Critana 6 lbs/acre PLS
Indian Ricegrass Nezpar 3 lbs/acre PLS
Shadscale saltbush 3 lbs/acre PLS
Globemallow .5 lbs/acre PLS
Total 17.5 lbs/acre
Saline LoWlands Seed Mix
Species Variety Drill Seeding Rate
Western wheatgrass Rosanna 6 lbs/acre PLS
Bottlebrush squirreltail 3 lbs/acre PLS
Gardner saltbush 2 lbs/acre PLS
Indian ricegrass 4 lbs/acre PLS
Total 15 lbs/acre
Wet Meadow/Marsh Seed Mix
5
-Species Variety Drill Seeding Rate
Alkali sacaton 3 lbs/acre PLS
Nebraska sedge 1 lbs/acre PLS
Tufted hairgrass 2 lbs/acre PLS
Alkali grass 4 lbs/acre PLS
Total 10 lbs/acre
Pure Live Seed (PLS) formula: % of purity of seed mixture times % germination of seed
mixture= portion of seed mixture that is PLS.
If pesticides are required, Mountain Gas Resources, Inc. will comply with all
applicable Federal and State laws. Pesticides will be used in accordance with
registered uses and within limitations imposed by the Secretary of Interior. Before
using pesticides, (including emergency situations, Mountain Gas Resources, Inc. will
obtain from the authorized officer a written approval of a plan showing the type and
quantity of material used, pe~t(s) to be controlled, method of application, location of
storage, disposal ofeqntainers, and any other information deemed necessary.
Mountain Gas Resources, Inc. will be responsible for weed control on the disturbed
areas within the established limits of the right of way. Mountain will coordinate with
the authorized officer or local authorities, to obtain acceptable weed control methods
for the disturbed areas within the right of way limits.
Mountain will obtain any necessary authorization to abandon the facilities from the
appropriate regulatory agency. The pipeline and all aboveground pipeline facilities
will also be removed and all unsalvageable materials will disposed of at authorized
sites. Regrading and revegetation of disturbed land areas (if apPlicable) will be
completed as necessary.
6
288
SMO
1, ' PROPOSED PIPELINE FOR
IFFIN & A$$OClATE$, INC. MOUNTAIN GAS ~$OU~CE$
HI~L WIG $1~8
'1414 ELK ST., SUITE 202 SCALE: 1" = 2000' TOTAL PROPOSED LENGTH: 25'.~
ROCK SPRINGS, WY82901 JOB No. 789'! ExISTING ROAD I TOPO MAt
(30 .......;028 DATE: 7/3'I/0~ii:ili: .: PROPOSED PIPELINE ........ ~ ,ct